The flexible hose from the fuel rail to the copper fuel line running down the chassis needed routed a bit better and some heat shrink on it to stop it rubbing on the electrical cables. in order to do this the Rocker cover bracket needed cut and re welded to stop the eblow fouling.
With that job done the covers could be fitted :) The connections from the heater box to the stainless heater pipes all linked up now as well.
The radiator mount was bolted in then the air filter was fitted and also the radiator, took a while to get done and everything connected up. The carbon link pipe was also dilled and the air temp sensor fitted.
All in all pretty happy with the progress this past month, project seems to be coming along heaps and bounds :)
No comments:
Post a Comment